000 | 01673naa a2200241 a 4500 | ||
---|---|---|---|
003 | AR-LpUFIB | ||
005 | 20250311170528.0 | ||
008 | 230201s2020 xx o 000 0 eng d | ||
024 | 8 |
_aDIF-M8803 _b9029 _zDIF008069 |
|
040 |
_aAR-LpUFIB _bspa _cAR-LpUFIB |
||
100 | 1 | _aOrtiz, Felipe | |
245 | 1 | 0 | _aA case study to validate feasibility of risk proposal in the deployment process of software systems |
300 | _a1 archivo (440,3 kB) | ||
500 | _aFormato de archivo PDF. -- Este documento es producción intelectual de la Facultad de Informática - UNLP (Colección BIPA/Biblioteca) | ||
520 | _aDeployment is the process by which a software system is transferred to a business client. A risk is defined as the likelihood for a loss to occur. In a software project, a risk might imply decreased quality of the software product, increased costs, a delay in project completion or a flaw, among others. A case study is developed with the aim to refine the set of risks. Furthermore, procedures are proposed for their prevention, mitigation and/or transfer for the software system deployment process. This article presents the results of a case study which analyzed the documentation related to deployment of functionalities in a bank’s Human Resources Portal conducted by an Argentina based software Small and Medium Enterprise | ||
534 | _aCongreso Argentino de Ciencias de la Computación (26to : 2020 : San Justo, Argentina), pp. 123-140. | ||
650 | 4 | _aGESTIÓN DE RIESGOS | |
653 | _asistemas de software | ||
700 | 1 | _aPanizzi, Marisa D. | |
700 | 1 | _aBertone, Rodolfo Alfredo | |
856 | 4 | 0 | _uhttp://dx.doi.org/10.1007/978-3-030-75836-3_9 |
942 | _cCP | ||
999 |
_c57841 _d57841 |